Journal · Quality
How to inspect a paint job (fairly)
A final walkthrough shouldn’t be a hunt with a flashlight, and it shouldn’t be a polite glance either. Here’s a fair method, the same one we use before we hand a room back.
Step 1: Set the light and the distance
The Painting Contractors Association’s P5 standard describes a properly painted surface as one examined without magnification from 39 inches or more, under the lighting that will be in place when the project is finished, from a normal viewing position. In plain terms: stand where a person would stand, with the lights and window light as they’ll be, and look.
A flashlight held flat against the wall exaggerates the normal texture of drywall and isn’t how anyone lives with a wall. It’s fine for spotting a missed area, not for grading the finish.
Step 2: Follow the lines
- Ceiling to wall: follow it around the whole room. Straight, no wobble, no ceiling color on the wall or the reverse.
- Wall to trim: baseboards, door and window casings, crown. Even edges, no paint on the wrong side.
- Accent walls: a clean, straight corner.
Step 3: Check coverage and sheen
- No old color showing through, including behind doors and above cabinets.
- Even sheen across each wall. Shiny or dull patches (flashing) often mean patches weren’t primed or touch-ups were done with a different technique.
- No roller marks, drips or brush marks visible from the normal viewing distance.
- On trim and doors: smooth, no runs on edges or hinge sides.
Step 4: Check the details
- Outlet covers and switch plates back on, unpainted.
- Hardware, hinges and door handles clean.
- Doors close and latch without sticking to fresh paint.
- Windows open; sashes not painted shut.
- Light fixtures, vents and smoke detectors free of paint.
Step 5: Check the house
- Floors and carpets clean, no drips.
- Furniture back where it was.
- Leftover paint labeled by room and color for future touch-ups.
Step 6: Write the punch list
Walk it together, put blue tape next to anything that needs attention, and write the list down. Agree on when it will be done. Payment terms in the contract should say when the final payment is due relative to the punch list.
Step 7: Keep the paperwork
File the warranty, the product list (brand, line, color and sheen for each room) and any touch-up paint. Our workmanship is covered by a written 5-year warranty, and the product list makes any future touch-up match.
What’s normal and what isn’t
| Usually normal | Worth flagging |
|---|---|
| Faint drywall texture visible only in raking light | Patches visible as bumps or halos from normal distance |
| Slight variation where a wall meets textured ceiling | Wavy or bleeding ceiling line |
| Fresh paint looking slightly different for a few days while it dries and cures | Old color showing through after it’s fully dry |
| Minor variation in a hand-brushed trim finish | Runs, sags or drips on doors and trim |
Inspection is one of our nine standards. If you’re planning a project, start with a virtual or in-person estimate.